Howard and Mervyn's world tour.

title


OCTOBER 2005

ENGLAND-St. Albans

                    We are now well on the way to finishing the caravan.  The back area consisting of shower, wash basin and toilet with a door is nearly finished, forward of this is a wardrobe, fridge/freezer and microwave, opposite Mervyn’s bed which has  a lifting bunk over it, this area is 99% finished.  The wet wardrobe is also complete.  The framework for the kitchen is Image0004ready to install and a start has been made on Howard’s over cab bunk.  The insulation of the Luton is complete.  The overhead kitchen cabinets are also under construction with the framework and the base finished ready to install.

                    Tuesday 11
th the over kitchen cupboards are now in place, awaiting the tambour doors.  The over table cupboards should be fixed in place by the end of this week.  The over cab bed is now awaiting fixing in place.  The electrics are 99% complete.  The kitchen will soon be fixed but the work top is still to be cut.  The extra seats have been ordered and they should take four weeksImage0009.  The water has been turned on  AND OFF, IT LEAKS, it will require at least a day to fix.

                  Sunday 23rd the over table cupboards are now glued in place.  The work starts tomorrow on fixing the kitchen unit in place, the route of the drainage pipes is still to be fixed.  Is nothing simple?  Next the small doors for the kitchen cupboards have to be made while we are waiting for the new seats.

NOVEMBER 2005

                Tuesday 29th the bathroom is complete, except for a cabinet to be added later.  The bedroom is complete.  Opposite the beds the wardrobe and the fridge/freezer and microwave section is also finished.  The over door cupboard needs a door but the six tambour doors, two over the table and four over the kitchen, are all in place.  The over cab bed is fitted and can be raised for easy access to the cab.  There are still two new seats to be fitted and the table to be made.


JANUARY 2006

                Saturday 14th having had a phone sensitive tracker fitted, Mervyn crossed the Channel into France.  Tuesday having travelled through France, Mervyn crossed into Spain, to travel in a south easterly direction to Javea where our friend Ann now lives.   

                Thursday 26th after skiing, Howard flew out to Javea (via Alicante) to be greeted by awful weather.  Rain, rain and still more rain.  The next ten days were spent visiting Ann.

SPAIN-Javea